1201 |
Job Evaluation & Merit Rating MWT-02 |
|
|
PDF Open |
|
|
|
1202 |
Job Costing MWT-02 |
|
|
PDF Open |
|
|
|
1203 |
Inspection & Testing Procedure- DT & NDT Methods MWT-02 |
|
|
PDF Open |
|
|
|
1204 |
CMT Lab functions MWT-02 |
|
|
PDF Open |
|
|
|
1205 |
POH of different types of Wagons in Workshops, POH of different types of Bogies of Wagons, Suspension System in wagon bogies, Spring failure: causes and remedies MWT-02 |
|
|
PDF Open |
|
|
|
1206 |
POH of Stainless Wagons in Workshops, Rehabilitation and Conversion of Wagons MWT-02 |
|
|
PDF Open |
|
|
|
1207 |
POH of ICF and LHB Coaches in Workshops MWT-02 |
|
|
PDF Open |
|
|
|
1208 |
Details and Comparison of ICF and FIAT Bogies in Coaches, POH of Bogies and their components, Suspension system in coach bogies, Spring failure: causes and remedies MWT-02 |
|
|
PDF Open |
|
|
|
1209 |
Coach Body Repair, Passenger Amenity Items, Bio Toilets & Bio-vacuum Toilet fitment during POH MWT-02 |
|
|
PDF Open |
|
|
|
1210 |
POH of TL & AC system of Coaches (ICF & LHB) MWT-02 |
|
|
PDF Open |
|
|
|
1211 |
Corrosion Repair Practice in Coaches & Wagons & Underframe MWT-02 |
|
|
PDF Open |
|
|
|
1212 |
Air Brake System of Coaches & Wagons, Twin pipe brake system in wagons, Coupler: Balance draft Gears, POH Procedure & Testing methods MWT-02 |
|
|
PDF Open |
|
|
|
1213 |
POH of different types of Locomotives in Workshops MWT-02 |
|
|
PDF Open |
|
|
|
1214 |
Wheel Shop, Flow and Maintenance Wheels, POH of Loco, Coaches and Wagon Bearings in Shops. MWT-02 |
|
|
PDF Open |
|
|
|
1215 |
NTXR Examination on Coaches & Wagons, NTXR reject able defects, Local Passing. MWT-02 |
|
|
PDF Open |
|
|
|
1216 |
Role of Stores Department in Workshops, Stock & Non-Stock Items, Stocking, EAC & AAC of Material. MWT-02 |
|
|
PDF Open |
|
|
|
1217 |
Stores drawl procedure MWT-02 |
|
|
PDF Open |
|
|
|
1218 |
Stocking Application procedure for new stock items, Standardization, Rationalization, Specification, Purchase Cycle MWT-02 |
|
|
PDF Open |
|
|
|
1219 |
Procurement of Non-Stock Items, Indenting, Requisitions, Technical Suitability, Local Purchase, IREPS, iMMIS, GeM, long term contracts MWT-02 |
|
|
PDF Open |
|
|
|
1220 |
Manufacture activities in Workshops MWT-02 |
|
|
PDF Open |
|
|
|