Sorry, you need to enable JavaScript to visit this website.
  • Today is: Saturday, December 14, 2024

You are here

Modified bio Tank with reduction in volume for Non CBC Coaches

Location, Zonal Railway/Division/Units where used : 
Motibagh Workshop, Nagpur/SEC Rly
Contact Person: 
CWM/MIBW
Brief description: 

Motibagh WS has fabricated 02 nos. modified bio Tank with reduction in volume for Non CBC Coaches by 30% with the following changes.

  • Adopter is removed.
  • Position of chlorine filter changed.( inside the last chamber)
  • Partition wall  1&2 marged.
  • Total capacity reduced by 30%.
  • Overflow from chamber 1st  to directly 3rd chamber.
  • All pipes are converted into C-channels.
  • Chamber 5 to 6 additional overflow pipe given.