111 | Trolley Mounted Lightening Arrangement |
To improve the lightening arrangement, air brake staff has designed developed and manufactured Trolley Mounted Lightening Arrangement for better illumination for testing of brake gear arrangement in the month of October’2017. |
PDF Open | |||
112 | Fixture for cleaning and painting of lower spring beam at Motibagh workshop |
Bogie section of Motibagh workshop has manufactured one fixture for cleaning and painting of lower spring beam . It rotates at 360 degree resulting easy for painting and welding. Also improve the quality and save time for repairing and painting. |
PDF Open | |||
113 | Modified bio Tank with reduction in volume for Non CBC Coaches |
Motibagh WS has fabricated 02 nos. modified bio Tank with reduction in volume for Non CBC Coaches by 30% with the following changes.
|
PDF Open | |||
114 | Cartridge Tapered Roller Bearing section - Wheel Shop |
CTRB section of Wheel shop was developed and declared as a Centre of Excellence on 27/11/2017. Various resources available in the section are as follows, 1. For cleaning, The following machines are being used. a) Grease purging machine b) Grease loosening machine and c) Cone cleaning machine 2. An air plug gauge (Make: Baker) is being used in Wheel shop which helps in measuring the diameter of double cup /cone assembly in CTRB bearings. This gauge can measure upto 0.1 micron and the tested data can be stored and retrieved from the system for reference. 3. Bore diameter of the cone is being measured using three legged digital micrometer. In order to measure other dimensions, seperate gauges are available which are being calibrated using a master gauge on regular basis. 4. Seperate storage area is available for storing various components of the CTRB bearing. 5. Laser engraving machine is being used for entering the details on CTRB bearing instead of manual etching process. 6. Automatic grease filling machine is being used after inspection instead of manual process. In addition to above machineries and gauges, the following works have been carried out to develop this section as a 'Centre of Excellence' a) Wheel Exhibit has been displayed showcasing the different set of wheels used in Indian Railways thereby preserving the Heritage assets. b) Epoxy flooring has been provided in the CTRB section in order to ensure a clean workplace. c) Wall panelling using compreg sheet, false ceiling facilities have been made as per RDSO checklist. d) In order to achieve Energy efficiency, LED lights and natural pipe lighting arrangments have been made. Enegy efficient air conditioner is being used.
|
PDF Open | |||
115 | Energy Saving in Dept Laundary | PDF Open | ||||
116 | Basic Training Centre |
BASIC TRAINING CENTRE, CARRAIGE REPAIR WORKSHOP, HUBBALLI - CENTER OF EXCELLENCE 1. Building, Infrastructure and Amenities: Two units: New & Old Building. Old Building has space with garden & The First Floor of Old BTC building is converted in to Welding Lab New Building has been provided with: Floor Tiles in all 05 class rooms, with Benches and with CCTV in class rooms useful for monitoring especially during conducting of Exams. 2. Models:
3. Courses: INDUCTION TRAINING.
ARTISAN STAFF
ACT APPRENTICE (1961 Act)
Railway Board Stage Wise Training Module for Refresher Courses (Welders, Fitters, Trimmers, Painters) is followed Special Refresher course for
4. Area: Total Area = 1460 Sq. Mt. Covered Area:
The Available Space adjacent to BTC in MSD was Annexed to increase the area by 120 Sq. Mt. 5. Conference Hall: Capacity of 110 Available. The conference Hall was converted to AC to take off the training events like Seminars, Workshops, Group Discussions, etc. as organized by Railways and External Agencies. 6. LCD Projectors: Provided in all Class Rooms to make all the Class Rooms into Digital Class Rooms 7. Computers: 06 Computers available. 8. Workshop Machine & Plants:
9. First Aid Boxes: Provided 10. Blind heavy fabric folds for windows& ventilators, for all classrooms and Conference hall |
PDF Open | |||
117 | SMART COACH |
An initiative by Modern Coach Factory towards predictive maintenance along with infotainment and advanced passenger amenities with introduction of PICCU (Passenger Information and coach computing Unit) |
PDF Open | |||
118 | BOGIE REPAIR SHOPP |
SAFETY: 100% provision of PPE to all workers, which include hard hats, safety gloves, safety shoes, ear dampeners and eye goggles. Improved lighting in bogie component, bogie assembly, bogie on-wheel and both bogie shop entry. LED lighting is preferred for better light spread and also better efficiency. Replaced kerosene with suitable water based cleaning agent for component cleaning. INFRASTRUCTURE: Provided Industrial flooring in leftover areas of bogie shop (bogie component, bogie assembly, bogie stacking and bogie on-wheel area). Ample space for Shock Absorber Overhauling room with 3 working areas.Provision of False Ceiling in Shock Absorber Room BMBC area was converted into stacking area for storage of bogie components such as: alternators and bolster springs. Bogie stacking is done in current bolster assembly area. Layout Improvements:
EQUIPMENTS: Introduction of pressure testing rig for leakage in lower spring seat for better identification of cracks. The said machine was made in-house by Mechanical Millwright Shop Dot peen marking machines are used for marking of new components to aid tracking during component failure(s) The Control panel for whiting jacks used in traffic for buffer height adjustment is replaced. Shotblasting machine: Bogie frame & Components are subjected to shot blasting, to increase identification of cracks, achive better surfacae finish/cleaning, also aids in reduction of failures by increasing quality of inspection. HOUSEKEEPING: 5s is implemented at bogie shop as a part of house keeping. Provision of various scrap bins with different color codes. |
PDF Open | |||
119 | AIR BRAKE SECTION |
SAFETY: LED lights are installed. INFRASTRUCTURE: New constructions and Painting is done, to keep cleanliness around the section. Pallets, Racks, material storage boxes are used by Air Brake Shop. White Washing done in DV and BMBC area. Working Models are displayed Epoxy Flooring/Painting of Air Brake Shop. Height of the False Ceiling in DV room is increased. New DV Room is inaugurated on 26.02.2019 for component overhauling. EQUIPMENTS: New Computerized Test Rigs HOUSEKEEPING: Color coded Dust bins and Scrap bins are provided. 5s is practiced to ensure good housekeeping and improving efficiency. Instruction Boards to be displayed along with drawings and procedures. |
PDF Open | |||
120 | Substantial improvement brought out by ART gang of UBL division for carrying out rescue operation of entrapped passengers during accidents. |
|
PDF Open |