Topics
SL. No. | Name | Links | Youtube Link | G Drive | Category | ||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
71 | Introduction to CNC Milling Trainer in IRIMEE |
Introduction to CNC Milling Trainer in IRIMEE |
PDF Open | ||||||||||||||||||||||||
72 | Load and Tractive effort transfer in LHB Bogies |
Load and Tractive effort transfer in LHB Bogies |
PDF Open | ||||||||||||||||||||||||
73 | Root Radius |
Root Radius |
PDF Open | ||||||||||||||||||||||||
74 | BOBRN and its POH in Jamalpur Workshop |
BOBRN and its POH in Jamalpur WOrkshop |
PDF Open | ||||||||||||||||||||||||
75 | Diesel Locomotive Wheels and Bearings and their POH in Jamalpur Workshop |
Diesel Locomotive Wheels and Bearings and their POH in Jamalpur Workshop |
PDF Open | ||||||||||||||||||||||||
76 | Carriage and Wagon |
All these videos are related to various important aspects of Carriage and Wagon wing. VideosWheel Distance Gauge 1Wheel Distance Gauge 2Buffer projection gauge for ICF CoachesTrack Gauge Measurement Indian Railways Institute of Mechanical EngineeringLearn APM Device Finalwedge block Wear Measurement CASNUB BogieUsing Lateral clerance gauge CASNUB BogieUsing Centre Pivot gauge CASNUB BogieLoad and Tractive effort transfer in LHB BogiesLoad and Tractive effort transfer in ICF BogiesPedestal Jaw Short CASNUB BogiePedestal Jaw Measurement Long CASNUB BogieSide frame friction plate CASNUB Bogie
|
PDF Open | ||||||||||||||||||||||||
77 | Buffers Fitment in Coaches |
Gadget for lifting of Side Buffers for fitment in coaches Make: Developed at Coaching Depot, Santragachi, South Eastern Railway Description: This rectangular shaped (120”x 14.5”) gadget (shown in picture below) is made up of SS pipes of 28 mm OD,1.5 mm thick with Sliding Table arrangement. This table is provided in such a way that the table with buffer can move freely on the longitudinal pipes of the gadget. There is a fixing arrangement at the ends of ‘A’ to be fixed with the bottom holes (2 nos.) on the head stock where the buffer to be fitted. Handles at the end ‘B’ have been provided for easy lifting of gadget manually. The gadget works as a Class 2 lever with fulcrum at end ‘A’ i.e. the head stock, effort at end ‘B’ and load (buffer) in between to achieve maximum Mechanical Advantage. Thus the gadget works successfully with less man power, time and ensuring safety. Requirements for fitment of buffer: i) Gadget for lifting of Side Buffers for fitment in coaches developed at SRC ii) Box Spanner, Size 36 iii) Manpower-3 persons to be provided iv) Wooden Skids- 4 nos.
Procedure for fitment of buffer: Before fitment of buffer in a coach, ensure protection of lines and provide skids on the lines to avoid rolling of wheels of the coach. Steps for fitment of buffer are mentioned as under:
Benefit:
|
PDF Open | ||||||||||||||||||||||||
78 | FIAT Bogie shop |
|
PDF Open | ||||||||||||||||||||||||
79 | Hand Book on Axle mounted FTIL make disc brake system of LHB coaches having speed more than 160 Kmph. | PDF Open | |||||||||||||||||||||||||
80 | Revised Compendium on IR-DRDO Bio-toilet for Indian Railways | PDF Open |