Topics
SL. No. | Name | Links | Youtube Link | G Drive | Category | |
---|---|---|---|---|---|---|
81 | About |
A Rolling Stock Knowledge Resource Portal in the domain http://rskr.railnet.gov.in has been created by the Railway Board. The objective of the portal is to provide a platform for exchange of ideas, posing of problems and providing solutions to the same by crowd sourcing and thus to create a platform for problem solving and encourage continual learning amongst officers, while posted on field assignments. In this Subject matter experts have been identified and they would moderate discussion threads on specific areas of interest. Nodal officers for each Zonal Railway,PU’s,IRIMEE,NAIR,COFMOW,CAMTECH & RDSO have been nominated.The Consignee Nodal officer of the work is EDME/Dev./RB. Any significant work done by the Zonal Railways/Units may be posted under Best Practices tab. The Zonal Railways/Units have also developed Centre of Excellence in various fields, the details of which may be posted under COE tab.
|
PDF Open | |||
82 | Nodel Officer Manual | PDF Open | ||||
83 | Blogger Manual | PDF Open | ||||
84 | Our Sitemap | PDF Open | ||||
85 | Feedback Form | PDF Open | ||||
86 | Feedback | PDF Open | ||||
87 | Bogie Shop |
RB vide No. RB No. 2017/M(W)/814/14 dated 04.01.2017 has advised creation of centre for excellence in Rolling Stock Maintenance in workshops alongwith identified work centres. Bogie shop was nominated to develop centre of excellence for Wagon Repair Workshop. Following actions were identified. After full compliance of the same, the Bogie shop was declared as Centre of Excellence for Wagon Repair Workshop Raipur in Nov’17. Srl. Items.
1. Availability of all equipments and gadget.
2. Material handling equipment.
3. Proper Flooring
4. Stacking of Material
5. Separation of clean and dirty area
6. Different Colour Scheme
7. Display of Instructions
8. Maintenance of side walls
9. Training of staff.
|
PDF Open | |||
88 | Manually operated Coach Window rod Snapper Tool for removing window Rod & Quick rescue of Passengers at Accident Site |
ART Team of Hubli Division of South Western Railways has developed a very effective Rescue Device for removing Coach window rods quickly. Hubli Division has developed two model variants : 1 m & 1.6m length Snapper tool with a C section Grip snapper made of HSS. The C Section Grip Snapper is having threaded connection to the Pipe as well as uniformly CO2 welded over the joint. The C section Grip Snapper is having opening of 13mm which holds & snaps the window rod from its roots very quickly & it can remove all rods of one windows in approx 30-45secs . It is manually operated. The Rescue staff has to grab the window rod with this tool & with slight force application , the rod will get removed from the base. This type of rod removal is very safe as compared to cutting of rods at corner by hydraulic devices since there is no sharp edge generated by this manual tool (which is there in hydraulic rod cutters,so Magnetic Covers were must to be used to avoid injury to passengers rushing out of the coach). This tool is very fast in operation as compared to Hydraulic rod cutters. It can remove all rods of a window in 30-40 secs average as compared to 5 mins time with hydraulic rod cutters. Also it removes the rod from its roots, so chances of injury to passenger rushing out of coach is very less. It is very cheaper & can be fabricated very easily in shops. |
PDF Open | |||
89 | Complete Digitization & Automation of Freight CTRB |
|
PDF Open | |||
90 | Parikalpo, Android based Coach POH costing APP |
OVERVIEW: Android based POH cost App has been developed at Liluah Workshop. This effort is the first of* its kind in entire Indian Railways The main aim of this APP* is uniform distribution of Inspection activities with material booking with respect to Work Orders. This APP will both be* Web Based and also freely downloadable from Play Store. The users will be* provided with Login ID and Passwords WORKING METHODOLOGY OF COACH POH COSTING APP:
SHOP SUPERVISOR ENTRIES IN COACH POH COSTING APP:
ADVANTAGES:
|
PDF Open | |||
91 | Traceability through RFID (Radio Frequency Identification) & QR (Quick Response) Code | PDF Open | ||||
92 | Repair of Rejected Unloadable wagons in Sidings |
IB valley region and Korba region have clusters of coal loading sidings. In each region 30 rakes each, coal is loaded every day. No. of wagons in a rake are rejected as unloadable. The unloadable return embedded empty, incurring loss in earnings. SECR has undertaken works of attending these rejected wagons before loading by doing temporary repairs, thus making loadable for at least one movement. The work is outsourced using mobile van loaded with Generator and Welding sets. The repair raw material MS plates are also loaded in Mobile van. The wagons rejected by siding authorities are attended and made temporary loadable. On an average 259 and 186 rejected wagons are made temporary loadable per day at IB valley region and Korba region respectively. Thus loss of earning @ Rs. 16000/Wagons/Day to the tune of Rs.71.2 lakhs is saved. In the process expenditure incurred is Rs. 0.59 lakhs per day. By this process SECR is saving/earning about 70.61 lakhs per day. |
PDF Open | |||
93 | 5S |
Sections certified 5S in 2017-18::
Sections certified 5S in 2018-19:
Highlights of Centre of Excellence
|
PDF Open | |||
94 | Flexible-Shaft mounted Powered Cleaning-Tool developed by staff of Yesvantpur Depot to de-stench bio-toilets. |
Stench removal from Bio-toilets/ normal toilets is a big challenge being faced on IR by coach maintenance wing. Many methods are being tried such as providing exhaust fans at location nearer to squatting pan, or fitting double ventury to have better natural ventilation. However, staff of YPR Depot of SWR looked at the problem a bit differently, they tried to pinpoint the source(s) of the bad-odour. They found that majorly stench emanates from Night Soil (NS) matter which gets stuck on inner surface of Straight Pipe and S- Pipe as well as on to the trash material ( like paper cups, etc.) inadvertently dropped by users in the toilet/pan. To handle all these sources of stench, the staff initially thought of using a Robotic Arm but finally ended up evolving a Flexible-Shaft mounted Powered Cleaning-Tool. This tool not only is able to effectively traverse and clean the complete straight and S- pipe passage but is able to pull out as well as push out the trash material Cost: - The total cost of the powered tool would be in the range of Rs 4000 to Rs 5000 including spare set of chargeable batteries. Actually the Flexible Shaft and tool costs approximately Rs 500 only and the cost of Battery Operated Drilling Machine on which this tool is mounted is Rs 3000 to Rs 4000. Time Taken: 4 to 5 minutes per toilet are adequate to clean the inner surfaces and for cleaning the S- type passage. From single charging of battery, approximately 9 to 10 coaches can be effectively dealt. Action Plan: Use Flexible-Shaft mounted Powered Cleaning-Tool developed by YPR depot is replicated in all Depots of SWR. All Primary Maintenance Trains of SWR have been covered on 31-08-2018 and the process is being repeated continuously in all SWR depots. It is proposed to provide the tool to OBHS staff also so that effective cleaning is ensured en route. |
PDF Open | |||
95 | Innovative equipment''s for ART. Equipment A:- Portable Mono Rail cum Road Trolley. Equipment B:- Spacer for Telescopic Lifting Jack |
Equipment A:- Multipurpose portable consisting of both Tapered wheels and tyre fixed on one mobile trolley which enabled to trolley operational both on mono rail as well as on flat surface using tyre. This multi utility trolley is extremely efficient while transporting heavy equipments on to accident site. This trolley consists of two numbers of MS solid tapered wheels and two rubber tyre, which can run on mono rail and road respectively. By providing this functionality trolley can be operated both on rail and road. It is a portable trolley which can be operated by single staff for transship of small items or two hydraulic jacks at a time to work spot quickly. Pushing handles are removable and can be fixed from both ends. Road wheels also removable whenever the ballast height is more by the side of rail. Flexible support brackets are fixed at both end of the trolley.
Equipment B:-Two telescopic lifting jacks and one displacement jack are connected to one control panel from which Re-railment operations can be carried out. This system is very easy to Re-rail the coach by using 4.4 meters Re-railing bridge even at the points and crossings. Spacer is made of two telescopic tubes is used to connect two Roller Carriages is take over the direct power transmission and routing. For re-railing the coach, single telescopic hydraulic jack is using below the head stock centre in conventional method. At present condition most of the coaches are fitted with Bio-Toilets. Due to this, place is very less in between two bio-toilets to keep the jack under head stock. In order to overcome this difficulty two telescopic lifting jacks are placed under second lifting pads of the coach (inside the trolley) over the Roller carriages which are connected by spacer. Coach will be lifted with two telescopic jacks simultaneously above the rail level, after those two jacks will be moved laterally as a single unit with the help of displacement jack (traverse jack) from one end to re-rail the coach. |
PDF Open | |||
96 | Course Material for Project Saksham In Wagon POH Workshop (Hindi) | PDF Open | ||||
97 | Quality improvements in Welding - Mysore Workshop |
The Welding team of Mysore Workshop is continuously focusing on the following areas related to Welding. i) Welder ii) Equipment iii) Joints iv) Consumable v) Process vi) Inspection i) Welder a) Welder Qualification through continuous assessment and competency certification. b) Imparting practical training to all the welders using ready reference drawings and Welding handbook. ii) Equipment a) Usage of advanced MIG/MAG synergic welding plants duly replacing the existing MMAW plants. b) Preparation of validation certificate for all the welding plants after inspection. c) Usage of better quality electrode holder, gloves and Auto darkening helmets. iii) Joints a) By imaprting continuous training to the welders, good fit ups are being done and poor fit ups are being properly assessed and rectified. iv) Consumable a) On proper selection of electrode, preheating according to the manufacturer's recommendation is essential for optimum results. In order to achieve this, a mother oven is being used and electrodes are being kept in quivers for maintaining the required temperature. b) Ensuring proper storage of comsumable items duly protecting from the environmental factors. v) Process a) Preparation and maintenance of test records and process records after the welding process. b) Welding based on Welding Specification Procedure in order to ensure an optimum result. vi) Inspection a) All the Inspection personnel involved in Welding operations are being sent to various training institutes for continuous improvement. b) Almost all the Inspection personnel have completed their certification course on Visual Inspection and DPT testing which resulted in drastic improvement during inspection.
|
PDF Open | |||
98 | FIBA for Air suspension |
Power point presentation about Failure Indication and Brake Application device |
PDF Open | |||
99 | Basics of CNC Programming (Trainer Model) |
CNC turning lathe (trainer model) is used to provide basic training of programming on various turning operations through simulation.
|
PDF Open | |||
100 | Energy Conservation in Generation of Compressed Air System |
DMW has saved 942120 Kwh of electricity (resulting in 35.39% saving of electric energy) during 2018-19 in generation & supply of compressed air by adopting following measures:
Above comprehensive measures resulted in saving of Rs. 79 Lakhs in generation & supply of compressed air. |
PDF Open | |||
101 | Multi layer wheel set stacking arrangement |
Multi layer wheel set stacking arrangement has been developed and provided in PP Yard/BIA. This streamlines wheel sets movement, enhance working space and easies out bogie section activities.
|
PDF Open | |||
102 | Multi Dimensional spring cleaning device at PP Yard/BIA |
In regular practice coil springs used in Bogie are being cleaned manually. During manual cleaning it is observed that dust particles are spread in the nearby area, which is not desirable. In addition to the above, carrying of spring from the dismntling area to the cleaning bench is also a laborious job. To get rid of the above a “Multi dimensional spring cleaning device” has been made with the available resources. A rejected unserviceable conveyor system has been used by providing motorized reduction gear box with chain sprocket system. It’s two sides are having protecting wings for safety purpose and four types of brushing arrangements provided for cleaning of springs in different ways. No new items used. Only scrap & unserviceable relevant items used. Hence total direct cost is Nil. Indirect cost for scrap value is Rs.10,000/- approximately & cost of man power is Rs.8000/- approximately. |
PDF Open | |||
103 | Basics of CNC Programming (Trainer Model) |
CNC turning lathe (trainer model) is used to provide basic training of programming on various turning operations through simulation. |
PDF Open | |||
104 | Heavy Corrosion attention - Mysore Workshop |
The following practices are being done during the corrosion attention of passenger coaches
|
PDF Open | |||
105 | Cleaning of breather plug to reduce wheel shelling in LHB Coaches |
Wheel shelling on wheel tread is a common problem in LHB coaches. This primarily occurs due to partial brake binding. When the brakes are not fully released, some amount of skidding takes place which gives flat spots on wheel tread. If this phenomenon occurs repeatedly, it eventually leads to metal chip off, also known as wheel shelling. As a result, the coach is then marked sick on this account if the length & depth of shelling spot becomes 40 mm or more and 1.5 mm or more respectively. Subsequently, the wheel needs to be changed by detaching the coach from rake. This involves a lot of efforts and a significant cost. During brake application and release process, air exhaust and intake takes place through a small part present in the brake cylinder integrated unit, known as ‘Breather plug’ (fig.1).During course of time, dust and other foreign particles deposit in the vent hole (fig.2). This obstructs the passage of air due to which brake application and releasing do not take place in a smooth manner, which eventually leads to intermittent skidding, thereby resulting in wheel shelling. The breather plug was then cleaned properly and installed back (fig.3). This practice was started from 01.02.2018. The condition of wheel before cleaning of breather plug (fig.4, wheel shelling marks can be seen) and after cleaning of breather plug (fig.5, wheel shelling marks have considerably reduced) is shown below. The cleaning of breather plug helps in smooth brake application and releasing, thereby preventing wheel skidding. |
PDF Open | |||
106 | Western commode with inbuilt ‘S’ trap and Cistern for better Flushing |
Flush cock provided in the coach toilet is very hard to operate and is located at inconvenient location. This creates reluctance amongst passengers to use it. As a result faecal discharge remains in the pan and causes bad odour in the coach toilet. To get rid of these problems the existing conventional western commode replaced with western commode inbuilt ‘S’ trap and Cistern for better flushing in three 1st AC coaches of train no. 18239/40 Shivnath Express on trial basis. Inbuilt S trap ensures smooth passage and establishes siphoning action. This is assisted by sudden discharge of limited quantity of water from Cistern (around 06 litres per flush), thus water efficient flushing. This also solve the problem of bad odour up to maximum possible extent by ensuring proper water column.
|
PDF Open | |||
107 | Natural forced ventilation in Bio Tank fitted toilets |
Prior to fitment of Bio Tanks in coach toilet, natural ventilation was available through commode chute. During run, air enters and taken away all the foul smell generated due to defecation and urination. After fitment of bio tank, the problem of foul smell persisted and was a source of passenger complaint. To overcome the problem of foul smell Natural forced ventilation system has been evolved using funnels. Two funnels have been provided in a coach facing forward and reverse directions each. Funnels are connected with coach toilet through pipes. |
PDF Open | |||
108 | Provision of Green toilet in Coaching Depot, BSP |
Two lavatories and two urinals were in abandoned condition in Coaching Depot, Bilaspur and the need of functional toilets was experienced several times for staff convenience as a welfare measure. However, that was requiring the complete dismantling of existing structure and rebuilding of new one along with connection to septic tank. Also the use of this existing toilet is unhygienic due to its outlet was open in atmosphere. The modification done by connecting the outlet of existing toilet with the serviceable biotank available in Coaching Depot by using 150 mm dia PVC pipe. Thus the problem of open discharge of defecation gets solved by biologically efficient way. |
PDF Open | |||
109 | Water Bottle crusher at Coaching Depot, BSP |
The sizable no. of empty water bottles are found in trains retuning to the base depot Bilaspur. The bottles otherwise are dumped in Garbage collection points for disposal by Municipality. It is seen that rag pickers collect the bottles for resell to the recyclers. In this process, the rag pickers litter the Garbage points and make proximity dirty. To recycle the same bottle crusher
|
PDF Open | |||
110 | Gadget for bending of Air Brake Pipe |
A gadget for bending of Air Brake Pipes was developed by a group of staff of Air Brake Section in the month of March’18 by utilizing one serviceable brake cylinder and some other scrap materials. It works with the aid of compressed air. The bending work carried out in cold condition of pipes. Due to cold bending grain structure of material do not changes as well as no stress develops. Desired angle of bend and finished are also achieved. |
PDF Open | |||
111 | Trolley Mounted Lightening Arrangement |
To improve the lightening arrangement, air brake staff has designed developed and manufactured Trolley Mounted Lightening Arrangement for better illumination for testing of brake gear arrangement in the month of October’2017. |
PDF Open | |||
112 | Fixture for cleaning and painting of lower spring beam at Motibagh workshop |
Bogie section of Motibagh workshop has manufactured one fixture for cleaning and painting of lower spring beam . It rotates at 360 degree resulting easy for painting and welding. Also improve the quality and save time for repairing and painting. |
PDF Open | |||
113 | Modified bio Tank with reduction in volume for Non CBC Coaches |
Motibagh WS has fabricated 02 nos. modified bio Tank with reduction in volume for Non CBC Coaches by 30% with the following changes.
|
PDF Open | |||
114 | Cartridge Tapered Roller Bearing section - Wheel Shop |
CTRB section of Wheel shop was developed and declared as a Centre of Excellence on 27/11/2017. Various resources available in the section are as follows, 1. For cleaning, The following machines are being used. a) Grease purging machine b) Grease loosening machine and c) Cone cleaning machine 2. An air plug gauge (Make: Baker) is being used in Wheel shop which helps in measuring the diameter of double cup /cone assembly in CTRB bearings. This gauge can measure upto 0.1 micron and the tested data can be stored and retrieved from the system for reference. 3. Bore diameter of the cone is being measured using three legged digital micrometer. In order to measure other dimensions, seperate gauges are available which are being calibrated using a master gauge on regular basis. 4. Seperate storage area is available for storing various components of the CTRB bearing. 5. Laser engraving machine is being used for entering the details on CTRB bearing instead of manual etching process. 6. Automatic grease filling machine is being used after inspection instead of manual process. In addition to above machineries and gauges, the following works have been carried out to develop this section as a 'Centre of Excellence' a) Wheel Exhibit has been displayed showcasing the different set of wheels used in Indian Railways thereby preserving the Heritage assets. b) Epoxy flooring has been provided in the CTRB section in order to ensure a clean workplace. c) Wall panelling using compreg sheet, false ceiling facilities have been made as per RDSO checklist. d) In order to achieve Energy efficiency, LED lights and natural pipe lighting arrangments have been made. Enegy efficient air conditioner is being used.
|
PDF Open | |||
115 | Energy Saving in Dept Laundary | PDF Open | ||||
116 | Basic Training Centre |
BASIC TRAINING CENTRE, CARRAIGE REPAIR WORKSHOP, HUBBALLI - CENTER OF EXCELLENCE 1. Building, Infrastructure and Amenities: Two units: New & Old Building. Old Building has space with garden & The First Floor of Old BTC building is converted in to Welding Lab New Building has been provided with: Floor Tiles in all 05 class rooms, with Benches and with CCTV in class rooms useful for monitoring especially during conducting of Exams. 2. Models:
3. Courses: INDUCTION TRAINING.
ARTISAN STAFF
ACT APPRENTICE (1961 Act)
Railway Board Stage Wise Training Module for Refresher Courses (Welders, Fitters, Trimmers, Painters) is followed Special Refresher course for
4. Area: Total Area = 1460 Sq. Mt. Covered Area:
The Available Space adjacent to BTC in MSD was Annexed to increase the area by 120 Sq. Mt. 5. Conference Hall: Capacity of 110 Available. The conference Hall was converted to AC to take off the training events like Seminars, Workshops, Group Discussions, etc. as organized by Railways and External Agencies. 6. LCD Projectors: Provided in all Class Rooms to make all the Class Rooms into Digital Class Rooms 7. Computers: 06 Computers available. 8. Workshop Machine & Plants:
9. First Aid Boxes: Provided 10. Blind heavy fabric folds for windows& ventilators, for all classrooms and Conference hall |
PDF Open | |||
117 | SMART COACH |
An initiative by Modern Coach Factory towards predictive maintenance along with infotainment and advanced passenger amenities with introduction of PICCU (Passenger Information and coach computing Unit) |
PDF Open | |||
118 | BOGIE REPAIR SHOPP |
SAFETY: 100% provision of PPE to all workers, which include hard hats, safety gloves, safety shoes, ear dampeners and eye goggles. Improved lighting in bogie component, bogie assembly, bogie on-wheel and both bogie shop entry. LED lighting is preferred for better light spread and also better efficiency. Replaced kerosene with suitable water based cleaning agent for component cleaning. INFRASTRUCTURE: Provided Industrial flooring in leftover areas of bogie shop (bogie component, bogie assembly, bogie stacking and bogie on-wheel area). Ample space for Shock Absorber Overhauling room with 3 working areas.Provision of False Ceiling in Shock Absorber Room BMBC area was converted into stacking area for storage of bogie components such as: alternators and bolster springs. Bogie stacking is done in current bolster assembly area. Layout Improvements:
EQUIPMENTS: Introduction of pressure testing rig for leakage in lower spring seat for better identification of cracks. The said machine was made in-house by Mechanical Millwright Shop Dot peen marking machines are used for marking of new components to aid tracking during component failure(s) The Control panel for whiting jacks used in traffic for buffer height adjustment is replaced. Shotblasting machine: Bogie frame & Components are subjected to shot blasting, to increase identification of cracks, achive better surfacae finish/cleaning, also aids in reduction of failures by increasing quality of inspection. HOUSEKEEPING: 5s is implemented at bogie shop as a part of house keeping. Provision of various scrap bins with different color codes. |
PDF Open | |||
119 | AIR BRAKE SECTION |
SAFETY: LED lights are installed. INFRASTRUCTURE: New constructions and Painting is done, to keep cleanliness around the section. Pallets, Racks, material storage boxes are used by Air Brake Shop. White Washing done in DV and BMBC area. Working Models are displayed Epoxy Flooring/Painting of Air Brake Shop. Height of the False Ceiling in DV room is increased. New DV Room is inaugurated on 26.02.2019 for component overhauling. EQUIPMENTS: New Computerized Test Rigs HOUSEKEEPING: Color coded Dust bins and Scrap bins are provided. 5s is practiced to ensure good housekeeping and improving efficiency. Instruction Boards to be displayed along with drawings and procedures. |