12 |
Duties of Officials at Accident Site MRT-08 |
View |
12 |
Production planning and scheduling MWT-03 |
View |
12 |
Review MET-04 |
View |
12 |
Safety on Small Tools, Electrical Appliances, Welding & cutting gases, Working on heights MRT-06 |
View |
12 |
Case Studies, cases in workshops, open line & Diesel Sheds, Mechanized Laundry Contract under BOOT model MRT-07 |
View |
12 |
Corrosion repairs MWT-04 |
View |
12 |
Value Engineering, types of needs and demands MWT-01 |
View |
12 |
Production planning and scheduling MWT-05 |
View |
12 |
Introduction to electrical energy generation, electrical safety, energy conservation MET-05 |
View |
12 |
Various rotating equipment such as TA, TM, EG/CA, AG, DB Blower, Fuel booster pump motor - Description /Overhauling/Repair/Testing, common problems & remedy (Alco & HHP), ECC & CCEM in Alco MDT-01 |
View |
12 |
Refrigeration Cycles MET07 |
View |
12 |
Safety on Small Tools and Electrical Appliances MRT-16 |
View |
12 |
Disaster Management - Role of Supervisors MCT-04 |
View |
13 |
Prevention of accident on C&W account MCT-04 |
View |
13 |
Assembly Drg of Foot Step Bearing MET-10 |
View |
13 |
Simple Harmonic Motion MET-01 |
View |
13 |
Toilet Systems: WRA and plumbing system, Bio-toilets & Bio-vacuum toilets MCT-03 |
View |
13 |
Details and Comparison of ICF and FIAT Bogies in Coaches, POH of Bogies and their components, Suspension system in coach bogies, Spring failure: causes and remedies MWT-02 |
View |
13 |
Customer Care MRT-11 |
View |
13 |
Process inventory control MWT-04 |
View |
13 |
Train Parting - Causes & remedies MCT-02 |
View |
13 |
Factories Act MRT-01 |
View |
13 |
Weighbridge, WILD and other way side monitoring systems: Overview MRT-04 |
View |
13 |
Review MCT-01 |
View |
13 |
Rescue Extrication Techniques & Fire Fighting MRT-08 |
View |
13 |
Process inventory control MWT-03 |
View |
13 |
Production Planning and scheduling MWT-01 |
View |
13 |
Use of PPE, Mock Drills MRT-06 |
View |
13 |
Review MRT-07 |
View |
13 |
Basic Electronics MET-05 |
View |
13 |
Excitation systems and Dynamic brake system (Alco & HHP), Transition system - circuit analysis, defects and remedy for Alco MDT-01 |
View |
13 |
Modifications done on coaching stock MWT-04 |
View |
13 |
Use of PPE MRT-16 |
View |
13 |
Properties of moist air MET07 |
View |
13 |
Diesel locomotives - types, Introduction of Electric Loco, EMU/MEMU & Train-Sets MRT-13 |
View |
14 |
Psychrometry of Air-Conditioning Process, Load calculation MET07 |
View |
14 |
Centrifugal Pumps MET-02 |
View |
14 |
ART/MFD/SPART/140 T Crane Maintenance MCT-04 |
View |
14 |
Assembly Drg of Plummer Block MET-10 |
View |
14 |
Review MRT-11 |
View |
14 |
Simple lifting machines MET-01 |
View |
14 |
Coach Body Repair, Passenger Amenity Items, Bio Toilets & Bio-vacuum Toilet fitment during POH MWT-02 |
View |
14 |
Industrial safety requirement & procedure MWT-04 |
View |
14 |
Tippler operation, Silo loading; recovery of damages during loading unloading from private siding, warranty claims of wagon items MCT-02 |
View |
14 |
Industrial Disputes Act MRT-01 |
View |
14 |
Diesel locomotives - types, Introduction of Electric Loco, EMU/MEMU & Train-Sets MRT-05 |
View |
14 |
Rescue Techniques- Medical Relief, Golden Hour, CPR MRT-08 |
View |
14 |
Industrial safety requirement & procedure MWT-03 |
View |
14 |
Process inventory control MWT-01 |
View |
14 |
Review MET-05 |
View |
14 |
Microprocessor based controls, APU, DEMU DPC, Distributed Power Control System (DPCS) MDT-01 |
View |
14 |
Role of Supervisors on Safety, Accident Reporting & Investigations MRT-16 |
View |
14 |
Role of Supervisors on Safety, Accident Reporting & Investigations MRT-06 |
View |
14 |
Important systems in a diesel locomotive: Fuel oil, lube oil, cooling water, turbo supercharging & brake system MRT-13 |
View |
14 |
Provision of safety fittings, provision of amenity fittings. MWT-04 |
View |
15 |
Painting of Coaches MWT-04 |
View |
15 |
Application of Air-conditioning in Railways MET07 |
View |
15 |
Performance of pumps MET-02 |
View |
15 |
WILD, Hot Box detector, Track side bogie monitoring system, Action to be taken on reporting MCT-04 |
View |
15 |
Assembly Drg of Screw Jack MET-10 |
View |