|
|
HIGH LEVEL COMMITTEE’S RECOMMENDATIONS |
View |
|
|
MRT 09 - TIME MANAGEMENT |
View |
|
|
Design-improve in AlCO loco New |
View |
|
|
Infrastructure facilities trainset depot |
View |
|
|
MDT-01 |
View |
|
|
payment of wages act |
View |
|
|
Safety Items in Coach |
View |
|
|
Basics of Traction and Locomotive Bogies |
View |
|
|
Simple Stress and Strain |
View |
|
|
Industry 4.0 |
View |
|
|
Elastic Constants |
View |
|
|
Budgeting |
View |
|
|
MWT-1 : Quality Management System (QMS) & TQM, ISO 9001 |
View |
|
|
Water Cooling system: LOCOMOTIVES |
View |
|
|
Window bar snapper tool developed at UBL depot |
View |
|
|
GAS CUTTING |
View |
|
|
MRT-10-3 Electrodes, Types of Joints |
View |
|
|
Trainee guide |
View |
|
|
MET 12 - BASIC OF METROLOGY & CALIBRATION |
View |
|
|
MWT 02 - WORK MEASUREMENT, METHOD STUDY, |
View |