Sorry, you need to enable JavaScript to visit this website.
  • Today is: Saturday, April 20, 2024

You are here

Armature lifting arrangement

Keywords for search(use comma / separator): 
TM Armature was being lifted by using Nylon belt during overhauling. In this case the load of armature was partially transferred from belt to evolutes of coil since it is touching at the edge. This may lead to failure of Armature as well as damage to rope
Location, Zonal Railway/Division/Units where used : 
SR/MAS/SSE/DSL/LW/PER
Contact Person: 
WM/LW/PER
Download resources in PDF: