Indian Railways Institute of Mechanical & Electrical Engineering
SL. No. | Name | Description | Course | Youtube Link | G Drive | Category | |
---|---|---|---|---|---|---|---|
81 | Revenue Model of various Railways |
This case study will propel the Trainee to examine various revenue models follwed by different Railwa systems and submit his assessment |
Probationers BIND |
PDF Open | |||
82 | Control Position |
For Probationers/ JET |
PDF Open | ||||
83 | RMPU and AC in LHB coaches |
A brief presentation about RMPU, coventional RMPU vs LHB RMPU, components of RMPU, hermetically sealed scroll compressor, Microprocessor based RMPU , RMPU control system, Sleep mode, Test mode, Emergency mode and advantages of RMPU |
PDF Open | ||||
84 | Heat load calculation for a Second AC coach |
Heat load calculation for a Second AC coach, an idea about various sources of heat input in a 2A coach and accordingly capacity requirement of cooling plant required |
TLAC |
PDF Open | |||
85 | Brake System of Rolling Stock |
Brake System of Rolling Stock |
PDF Open | ||||
86 | Auto Engine Shut down with Auxiliary Power Unit |
This presentation is about the most effective fuel saving device without any stress to drivers. |
Probationers, SSE and JEs and Crew training. |
PDF Open | Watch | ||
87 | ALCO Locomotive Bogies |
At the end of the session we will be able to know about the Alco loco bogies nomenclature, defects, checking a ready loco, suspension etc |
PDF Open | ||||
88 | Bearing Technology |
It describes about types of bearings used in railway and its technical aspects. |
PDF Open | ||||
89 | Rail Wheel Interaction | PDF Open | |||||
90 | Overview of Material Management |
An overview of Material Management over Indian Rialways |
MSMP for Probationers |
PDF Open |