Topics
SL. No. | Name | Links | Youtube Link | G Drive | Category | |
---|---|---|---|---|---|---|
261 | H- type CBC Measurements |
This presentation explains the various measuremsnts of H- type CBC using guages in a picturesque way. |
PDF Open | |||
262 | MCT 07 |
Module of Coaching Theory |
PDF Open | |||
263 | RC C&W Material |
RC C&W Study Material |
PDF Open | |||
264 | LHB Air Brake Booklet |
LHB coaches Air Brake System Booklet |
PDF Open | |||
265 | LHB Pitline Maintenance Practices |
LHB Pitline Examination for Openline C&W SSEs/ JEs & Staff |
PDF Open | |||
266 | MCT 01 |
Module Of Coaching Theory 01 |
PDF Open | |||
267 | MCT 02 |
Module of Coaching Theory 02 |
PDF Open | |||
268 | Work Study- Method Study |
This is a study material pertaining to Work Study - Method Study - prepared for trainees of Work Study Course of Initial and Refresher Training for Serving Work study Inspectors. |
PDF Open | |||
269 | MCT 06 |
Module of Coaching Theory 06 |
PDF Open | |||
270 | Work study- Work Measurement |
This is a study material pertaining to Work Study - Work MEasurement - prepared for trainees of Work Study Course of Initial and Refresher Training for Serving Work study Inspectors. |
PDF Open | |||
271 | Work study |
This is a presentation expalining the Work study and its ypes - Method Study and Work Measurement , breif about itheir proecedures, advantages and disadvantages etc. |
PDF Open | |||
272 | FIAT Bogie Shop Schedules |
This prresentation explains various activities to be carried out for FIAT bogie shop schedules (SS-I, SS-II and SS-III) including must change items at Workshops . |
PDF Open | |||
273 | Incentive Schemes at Workshops - CLW pattern |
This presentation explores the concepts of incentive scheme adaption in Indian Railway Production Units and Workshops. It further focuses on the salient features of Chittaranjan Loco Works pattern Incentive scheme.and also list out advantages and limitations of the scheme. |
PDF Open | |||
274 | Incentive Schemes at Workshops - Group Incentive Scheme |
This presentation discuses the limitations of CLW pattern incentive scheme and it further focuses on the salient features of Group Incentive Scheme. (GIS) and also list out advantages and limitations of the scheme. |
PDF Open | |||
275 | Promotee JEs- Session _I Module (MJP-Session-I) |
This is a study material for App.JEs (Promotees) of Session -I training at STC. |
PDF Open | |||
276 | PU Painting |
This presentation explains the procedure for PU painting to LHB coaches at Workshops. |
PDF Open | |||
277 | IOH of ICF bogie |
This presentation explains the IOH practices to ICF bogie at Workshops. It also touches some repeated complaints received from divisons . |
PDF Open | |||
278 | Green Workshop |
This presentation covers the green initiatives taken at workshop level, various methods to be adopted to achieve the development and further explains the advantages of its implementation. |
PDF Open | |||
279 | Comparison- HHP Vs Alco locomotives |
In this PPT, HHP diesel locomotive is compared with Alco diesel locmotives on the basis of working systems, design and components involved. |
PDF Open | |||
280 | Load Box Testing of Alco locomotives |
This PPT briefly explain- How to do LBT, when, what parameters are to be recorded & how SFC is to be calculated . |
PDF Open |