Sorry, you need to enable JavaScript to visit this website.
  • Today is: Monday, December 23, 2024
SL. No. Name Description Course PDF Youtube Link G Drive Category
381 MCT 01

Types of wagon

Types of wagon

PDF Open
382 MWT 01 PU Painting

APP.SSE/JE/Workshop

APP SSE & JE

PDF Open
383 Control Position

For Probationers/ JET

PDF Open
384 RMPU and AC in LHB coaches

A brief presentation about RMPU, coventional RMPU vs LHB RMPU, components of RMPU, hermetically sealed scroll compressor, Microprocessor based RMPU , RMPU control system, Sleep mode, Test mode, Emergency mode and advantages of RMPU

PDF Open
385 Heat load calculation for a Second AC coach

Heat load calculation for a Second AC coach, an idea about various sources of heat input in a 2A coach and accordingly capacity requirement of cooling plant required

TLAC

PDF Open
386 Brake System of Rolling Stock

Brake System of Rolling Stock

PDF Open
387 Auto Engine Shut down with Auxiliary Power Unit

This presentation is about the most effective fuel saving device without any stress to drivers.

Probationers, SSE and JEs and Crew training.

PDF Open
388 ALCO Locomotive Bogies

At the end of the session we will be able to know about the Alco loco bogies nomenclature, defects, checking a ready loco, suspension etc

PDF Open
389 Bearing Technology

It describes about types of bearings used in railway and its technical aspects.

PDF Open
390 Rail Wheel Interaction PDF Open
391 Overview of Material Management

An overview of Material Management over Indian Rialways

MSMP for Probationers

PDF Open
392 MCT-02 Lay out of coaching Depot

MJR/MJI

App.JE(C&W)

PDF Open
393 Infrastreucture Development for Rolling Stock Maintenance over IR

Infrastructure development for rolling stock maintenance over indian railways

C&W Module

PDF Open
394 Safety Features in Coaches

Overview of Safety features on passenger coach in order to protect its occupants

C&W Module

PDF Open
395 Features of Bogie Couplers of EMU DEMU

Overview of features of Coupolers, bogies of DEMU EMU MEMU

PDF Open
396 MCT-02 Infrastructure of goods yard

lay out of goods  depots 

MJR-C

MJI-C

PDF Open
397 MCT-01 LHB

LHB COACH

MJR/MJI

PDF Open
398 EMU Shed Infrastructure PDF Open
399 WHEEL SLIDE PROTECTION DEVICE(WSP)

It contains working principle of wheel slide protection.It also contains brief description of major parts, testing procedure and defect codes with trouble shooting of WSP

PDF Open
400 INFRASTRUCTURE FACILITIES FOR FREIGHT YARD,SICK LINE AND ROH DEPOT

It contains infrastructure facilities for freight yard, sick line, ROH depot and categorization of examination.

PDF Open