Topics
SL. No. | Name | Links | Youtube Link | G Drive | Category | |
---|---|---|---|---|---|---|
361 | MRT-1 for Induction training for SSEs/JEs |
This is a study material for Induction Course to App.SSEs/JEs. This material includes all the contents of MRT-1 module like Organization of Indian Railways , Recruitment and training , General Conditions of service, Medical Attendance Rules, Leave Rules, Pass Rules Conduct Rules, DAR, Payment of Wages Act, Minimum Wages Act 01, Employee’s Compensation Act, Hours of Employment Regulations, Factories Act, Industrial Disputes Act, NPS, RESS, PF, Pension & Other Retirement benefits, Welfare Measures, Organization and objectives of Stores branch, Classification and Codification of Stores, Procurement of stores - Non-Stock, Recoupment of stores - Stock item, Drawal of Stores, Scrap disposal, Disposal of surplus stores, Organization and objectives of Accounts branch, Budgeting.etc. |
PDF Open | |||
362 | MRT-3 for Induction Course to SSEs/JEs |
This is a study materual for induction course to App.SSEs/JEs. This course contents include role of C&W workshop, objectives, organisation, layout, activities of different shops. |
PDF Open | |||
363 | MRT-2 for induction Course to SSEs/JEs |
This is a study material for induction course to App.SSEs/JEs. This material includes contents like Organisation and objectives of Mechanical Dept., Types Rolling Stock, Production units, Workshops, C&W Depot, Diesel Shed,etc. |
PDF Open | |||
364 | MRT-3,4,5 for Induction Course to SSEs/JEs |
This is a study material for induction course to App.SSEs/JEs. This notes covers various topics in rolling stock as a introduction/familiarisation to the newly recruited SSEs/JEs. |
PDF Open | |||
365 | DEMU 1600 |
Brief discription about DEMU 1600 DPC |
PDF Open | |||
366 | LOCO parameter AIP |
Parameters of LOCO to be recorded after Accident |
PDF Open | |||
367 | Rake test (LHB Coach) |
Rake test of LHB coach |
PDF Open | |||
368 | Salient features of LHB coach |
Salient features of LHB coach |
PDF Open | |||
369 | Rake test (LHB Coach) |
Rake test of LHB coach |
PDF Open | |||
370 | CBC |
CBC HTYPE |
PDF Open | |||
371 | MCT-01 Balance type draft gear | PDF Open | ||||
372 | Infrastructure Overview - IR Vis a Vis Road & Aviation sector |
This presnetation gives a compartative statistics of growth of IR vis a vis other Transport Sectors |
PDF Open | |||
373 | Study of Transition of management Structure in Japan National Railways & British Rail |
This presnetation gives a brief background on Change in Management structure of Japan National Railways and British Railways and its brush with Privatisation excercise |
PDF Open | |||
374 | Inter- departmental Case Studies |
THis video presnets instances of case studies of interdepartmntal coordination between various departmnets in Railways and outside |
PDF Open | Watch | ||
375 | History of Jamalpur |
Brief History of Railways in Jamalpur and Indian Railway Institte of Mechanical & Electrical Engineering |
PDF Open | Watch | ||
376 | Discipline & Appeal Rules 1968 |
Discipline & Appeal Rules 1968 |
PDF Open | |||
377 | DEMU Body |
Brief discription about DEMU Body |
PDF Open | |||
378 | Classification of Freight Stocks |
Classification of Freight Stocks |
PDF Open | |||
379 | Assignment for Manual of office Procedure session |
This is mock excercise on how noting and drafings should be prepared. The Traineer should assign the work to individual and check for accuracy & perecision of output |
PDF Open | |||
380 | Revenue Model of various Railways |
This case study will propel the Trainee to examine various revenue models follwed by different Railwa systems and submit his assessment |
PDF Open | |||
381 | MCT 01 |
Types of wagon |
PDF Open | |||
382 | MWT 01 PU Painting |
APP.SSE/JE/Workshop |
PDF Open | |||
383 | Control Position | PDF Open | ||||
384 | RMPU and AC in LHB coaches |
A brief presentation about RMPU, coventional RMPU vs LHB RMPU, components of RMPU, hermetically sealed scroll compressor, Microprocessor based RMPU , RMPU control system, Sleep mode, Test mode, Emergency mode and advantages of RMPU |
PDF Open | |||
385 | Heat load calculation for a Second AC coach |
Heat load calculation for a Second AC coach, an idea about various sources of heat input in a 2A coach and accordingly capacity requirement of cooling plant required |
PDF Open | |||
386 | Brake System of Rolling Stock |
Brake System of Rolling Stock |
PDF Open | |||
387 | Auto Engine Shut down with Auxiliary Power Unit |
This presentation is about the most effective fuel saving device without any stress to drivers. |
PDF Open | Watch | ||
388 | ALCO Locomotive Bogies |
At the end of the session we will be able to know about the Alco loco bogies nomenclature, defects, checking a ready loco, suspension etc |
PDF Open | |||
389 | Bearing Technology |
It describes about types of bearings used in railway and its technical aspects. |
PDF Open | |||
390 | Rail Wheel Interaction | PDF Open | ||||
391 | Overview of Material Management |
An overview of Material Management over Indian Rialways |
PDF Open | |||
392 | MCT-02 Lay out of coaching Depot |
MJR/MJI |
PDF Open | |||
393 | Infrastreucture Development for Rolling Stock Maintenance over IR |
Infrastructure development for rolling stock maintenance over indian railways |
PDF Open | |||
394 | Safety Features in Coaches |
Overview of Safety features on passenger coach in order to protect its occupants |
PDF Open | |||
395 | Features of Bogie Couplers of EMU DEMU |
Overview of features of Coupolers, bogies of DEMU EMU MEMU |
PDF Open | |||
396 | MCT-02 Infrastructure of goods yard |
lay out of goods depots |
PDF Open | |||
397 | MCT-01 LHB |
LHB COACH |
PDF Open | |||
398 | EMU Shed Infrastructure | PDF Open | ||||
399 | WHEEL SLIDE PROTECTION DEVICE(WSP) | PDF Open | ||||
400 | INFRASTRUCTURE FACILITIES FOR FREIGHT YARD,SICK LINE AND ROH DEPOT | PDF Open |