Sorry, you need to enable JavaScript to visit this website.
  • Today is: Tuesday, May 6, 2025

You are here

Topics

SL. No. Name Links PDF Youtube Link G Drive Category
361 MRT-1 for Induction training for SSEs/JEs

This is a study material for Induction Course to App.SSEs/JEs. This material includes all the contents of MRT-1 module like Organization of Indian Railways , Recruitment and training , General Conditions of service, Medical Attendance Rules,  Leave Rules,  Pass Rules  Conduct Rules, DAR, Payment of Wages Act, Minimum Wages Act 01, Employee’s Compensation Act, Hours of Employment Regulations,  Factories Act, Industrial Disputes Act, NPS, RESS, PF, Pension & Other Retirement benefits, Welfare Measures, Organization and objectives of Stores branch, Classification and Codification of Stores, Procurement of stores - Non-Stock, Recoupment of stores - Stock item, Drawal of Stores, Scrap disposal, Disposal of surplus stores, Organization and objectives of Accounts branch, Budgeting.etc.

PDF Open
362 MRT-3 for Induction Course to SSEs/JEs

This is a study materual for induction course to App.SSEs/JEs. This course contents include role of C&W workshop, objectives, organisation, layout, activities of different shops.

PDF Open
363 MRT-2 for induction Course to SSEs/JEs

This is a study material for induction course to App.SSEs/JEs. This material includes contents like Organisation and objectives of Mechanical Dept., Types Rolling Stock, Production units, Workshops, C&W Depot, Diesel Shed,etc.

PDF Open
364 MRT-3,4,5 for Induction Course to SSEs/JEs

This is a study material for induction course to App.SSEs/JEs. This notes covers various topics in rolling stock as a introduction/familiarisation to the newly recruited SSEs/JEs.

PDF Open
365 DEMU 1600

Brief discription about DEMU 1600 DPC

PDF Open
366 LOCO parameter AIP

Parameters of LOCO to be recorded after Accident

PDF Open
367 Rake test (LHB Coach)

Rake test of LHB coach

PDF Open
368 Salient features of LHB coach

Salient features of LHB coach

PDF Open
369 Rake test (LHB Coach)

Rake test of LHB coach

PDF Open
370 CBC

CBC HTYPE

PDF Open
371 MCT-01 Balance type draft gear PDF Open
372 Infrastructure Overview - IR Vis a Vis Road & Aviation sector

This presnetation gives a compartative statistics of growth of IR vis a vis other Transport Sectors 

PDF Open
373 Study of Transition of management Structure in Japan National Railways & British Rail

This presnetation gives a brief background on Change in Management structure of Japan National Railways and British Railways and its brush with Privatisation excercise 

PDF Open
374 Inter- departmental Case Studies

THis video presnets instances of case studies of  interdepartmntal coordination between various departmnets in Railways and outside 

PDF Open
375 History of Jamalpur

Brief  History of Railways in Jamalpur and Indian Railway Institte of Mechanical & Electrical Engineering 

PDF Open
376 Discipline & Appeal Rules 1968

Discipline & Appeal Rules 1968

PDF Open
377 DEMU Body

Brief discription about DEMU Body

PDF Open
378 Classification of Freight Stocks

Classification of Freight Stocks

PDF Open
379 Assignment for Manual of office Procedure session

This is mock excercise on how noting and drafings should be prepared. The Traineer should assign the work to individual and check for accuracy & perecision of output 

PDF Open
380 Revenue Model of various Railways

This case study will propel the Trainee to examine various revenue models follwed by different Railwa systems and submit his assessment 

PDF Open
381 MCT 01

Types of wagon

PDF Open
382 MWT 01 PU Painting

APP.SSE/JE/Workshop

PDF Open
383 Control Position PDF Open
384 RMPU and AC in LHB coaches

A brief presentation about RMPU, coventional RMPU vs LHB RMPU, components of RMPU, hermetically sealed scroll compressor, Microprocessor based RMPU , RMPU control system, Sleep mode, Test mode, Emergency mode and advantages of RMPU

PDF Open
385 Heat load calculation for a Second AC coach

Heat load calculation for a Second AC coach, an idea about various sources of heat input in a 2A coach and accordingly capacity requirement of cooling plant required

PDF Open
386 Brake System of Rolling Stock

Brake System of Rolling Stock

PDF Open
387 Auto Engine Shut down with Auxiliary Power Unit

This presentation is about the most effective fuel saving device without any stress to drivers.

PDF Open
388 ALCO Locomotive Bogies

At the end of the session we will be able to know about the Alco loco bogies nomenclature, defects, checking a ready loco, suspension etc

PDF Open
389 Bearing Technology

It describes about types of bearings used in railway and its technical aspects.

PDF Open
390 Rail Wheel Interaction PDF Open
391 Overview of Material Management

An overview of Material Management over Indian Rialways

PDF Open
392 MCT-02 Lay out of coaching Depot

MJR/MJI

PDF Open
393 Infrastreucture Development for Rolling Stock Maintenance over IR

Infrastructure development for rolling stock maintenance over indian railways

PDF Open
394 Safety Features in Coaches

Overview of Safety features on passenger coach in order to protect its occupants

PDF Open
395 Features of Bogie Couplers of EMU DEMU

Overview of features of Coupolers, bogies of DEMU EMU MEMU

PDF Open
396 MCT-02 Infrastructure of goods yard

lay out of goods  depots 

PDF Open
397 MCT-01 LHB

LHB COACH

PDF Open
398 EMU Shed Infrastructure PDF Open
399 WHEEL SLIDE PROTECTION DEVICE(WSP) PDF Open
400 INFRASTRUCTURE FACILITIES FOR FREIGHT YARD,SICK LINE AND ROH DEPOT PDF Open